Energy in Japan refers to energy and electricity production, consumption, import and export in Japan. The country’s primary energy consumption was 477.6 Mtoe in 2011, a decrease of 5% over the previous year.

The country lacks significant domestic reserves of fossil fuel, except coal, and must import substantial amounts of crude oil, natural gas, and other energy resources, including uranium. Japan relied on oil imports to meet about 84 percent of its energy needs in 2010. Japan was also the first coal importer in 2010, with 187 Mt (about 20% of total world coal import), and the first natural gas importer with 99 bcm (12.1% of world total gas import).

While Japan had previously relied on nuclear power to meet about 30% of its electricity needs, after the 2011 Fukushima Daiichi nuclear disaster all nuclear reactors have been progressively shut down for safety concerns. Ōi Nuclear Power Plant’s reactor No. 3 was eventually restarted on 2 July 2012. However, in September 2013 the plant was shut down in order for Ōi Nuclear Power Plant to undergo safety inspections and pass legal checks in order to reopen. On August 11, 2015 and November 1, 2015 the two reactors at the Sendai Nuclear Power Plant restarted. Following the Fukushima disaster, the general public has opposed the use of nuclear energy.

Overview

Energy in Japan

Population
(million)
Prim. energy
(TWh)
Production
(TWh)
Import
(TWh)
Electricity
(TWh)
CO2-emission
(Mt)
2004 127.7 6,201 1,125 5,126 1,031 1,215
2007 127.8 5,972 1,052 5,055 1,083 1,236
2008 127.7 5,767 1,031 4,872 1,031 1,151
2009 127.3 5,489 1,091 4,471 997 1,093
2010 127.4 5,778 1,126 4,759 1,070 1,143
2012 127.8 5,367 601 4,897 1,003 1,186
2012R 127.6 5,260 329 5,062 989 1,223
2013 127.3 5,288 325 5,082 998 1,235
Change 2004–10 -0.2% -6.8% 0.0% -7.2% 3.7% -5.9%
Mtoe = 11.63 TWh, Prim. energy includes energy losses that are 2/3 for nuclear power

2012R = CO2 calculation criteria changed, numbers updated

History
apan’s rapid industrial growth since the end of World War II doubled the nation’s energy consumption every five years into the 1990s. During the 1960–72 period of accelerated growth, energy consumption grew much faster than GNP, doubling Japan’s consumption of world energy. By 1976, with only 3% of the world’s population, Japan was consuming 6% of global energy supplies.

Compared with other nations, electricity in Japan is relatively expensive, and, since the loss of nuclear power after the earthquake and tsunami disaster at Fukushima, the cost of electricity has risen significantly.

Energy sources

Primary energy production in Japan by source ( Mtep )
Source 1990 % 2000 % 2010 % 2014 2015 % 2015 var.
2015/1990
Coal 4.31 5.8 1.52 1.5 0 0 0 0 0% -100%
Oil 0.69 0.9 0.77 0.7 0.69 0.7 0.51 0.47 1.6% -31%
Natural gas 1.92 2.6 2.28 2.2 3.21 3.2 2.40 2.38 7.9% + 24%
Total fossils 6.92 9.3 4.58 4.4 3.90 3.9 2.91 2.85 9.4% -59%
Nuclear 52.71 70.7 83.93 80.2 75.11 75.9 0 2.46 8.1% -95%
Hydraulic 7.47 10.0 7.33 7.0 7.07 7.1 7.03 7.33 24.2% -2%
Biomass waste 4.52 6.1 4.72 4.5 9.32 9.4 10.94 11.39 37.6% + 152%
Solar, wind, geoth. 2.96 4.0 4.04 3.9 3.60 3.6 5.29 6.25 20.6% +111%
Total EnR 14.95 20.0 16,09 15.4 19.98 20.2 23.26 24.97 82.5% +67%
Total 74.58 100 104.60 100 99,00 100 26.18 30.28 100% -59%
Data Source: International Energy Agency 

In 1950 coal supplied half of Japan’s energy needs, hydroelectricity one-third, and oil the rest. By 2001 the contribution of oil had increased to 50.2% of the total, with rises also in the use of nuclear power and natural gas. Japan now depends heavily on imported fossil fuels to meet its energy demand.

Japan currently produces about 10% of its electricity from renewable sources. The Fourth Strategic Energy Plan set the renewable share goal to be 24% by 2030. In the next 15 years, Japan intends on investing $700 billion into renewable energy. One initiative the Japanese government has implemented in order to boost the amount of renewable energy produced and purchased in Japan is the feed-in tariff scheme. The scheme encourages companies to invest in renewable energy by providing set prices for various types of renewable energy. The initiatives appear to be working, as renewable energy generation capacity now stands at 26.2 GW, compared to 20.9 GW in 2012.

Oil
In the wake of the two oil crises of the 1970s (1973 and 1979), Japan made efforts to diversify energy resources in order to increase security. Japan’s domestic oil consumption dropped slightly, from around 5.1 million barrels (810,000 m3) of oil per day in the late 1970s to 4.9 million barrels (780,000 m3) per day in 1990. While the country’s use of oil declined, its consumption of nuclear power and Natural gas rose substantially. Several Japanese industries, including electric power companies and steelmakers, switched from petroleum to coal, most of which is imported.

The state stockpile equals about 92 days of consumption and the privately held stockpiles equal another 77 days of consumption for a total of 169 days or 579 million barrels (92,100,000 m3). The Japanese SPR is run by the Japan Oil, Gas and Metals National Corporation.

Oil demand has been waning in Japan, especially leading up to and since the Tohoku earthquake in 2011. While oil consumption was over 5 million barrels per day (bpd) for decades, this had declined to 3.22 million bpd by 2017. As of 2016, both India and Texas have overtaken Japan in oil consumption.

Nuclear power
Following Eisenhower’s Atoms for Peace speech, the United States helped Japan develop their nuclear power program. When Japan decided to embark on the nuclear power field, it imported technology from the United States and obtained uranium from Canada, France, South Africa, and Australia. The first nuclear reactor was commissioned in 1966, from then to 2010, 54 more nuclear reactors had opened, with total generation capacity of 48,847 MW. The ratio of nuclear power generation to total electricity production increased from 2% in 1973 to around 30% in March 2011. During the 1980s, Japan’s nuclear power program was strongly opposed by environmental groups, particularly after the Three Mile Island accident in the United States. In the 2000s, Japan had a few of the modern Advanced Boiling Water Reactor, including some of the first new advanced Generation III reactors. At Rokkasho, Aomori a facility was built to enrich nuclear fuel, deal with nuclear waste, and recycle spent nuclear fuel.

After the 2011 earthquake and tsunami some nuclear reactors were damaged, causing much uncertainty and fear about the release of radioactive material, as well as highlighting the ongoing concerns over seismic design standards (see Nuclear power in Japan §Seismicity). On 5 May 2012 Japan shut down the last nuclear reactor, the first time there has been no nuclear power production since 1970. On 16 June Prime Minister Yoshihiko Noda ordered the restart of Ōi nuclear plant’s reactors number 3 and 4, saying that people’s livelihood needs to be protected. Ōi nuclear plant’s reactor No. 3 was restarted on 2 July, and No. 4 began operation on 21 July. However, in September 2013 the Ōi nuclear plant was shut down in order to have extensive safety inspections performed. By late 2015, both of the Sendai Nuclear Power Plant’s reactors had reopened and restarted producing nuclear energy. Other nuclear plants, such as the Takahama Nuclear Power Plant, have received permission to reopen, and other nuclear reactors are beginning the process of restarting.

In June 2015, the Japanese government released an energy proposal that includes the revival of nuclear power to account for Japan’s energy needs. The proposal calls for an increase of about 20% in nuclear energy by 2030. This reverses a decision by the previous Democratic Party, the government will re-open nuclear plants, aiming for “a realistic and balanced energy structure”.

Natural gas
Because domestic natural gas production is minimal, rising demand is met by greater imports. Japan’s main LNG suppliers in 1987 were Indonesia (51.3%), Malaysia (20.4%), Brunei (17.8%), United Arab Emirates (7.3%), and the United States (3.2%).

The new Japanese LNG strategy published in May 2016 envisages the creation of a liquid market and an international LNG hub in Japan. This promises to radically change the traditional JCC (crude oil) based pricing system in Japan, but also potentially in the Pacific Basin as a whole. But the path to hub creation and hub pricing in the early 2020s envisaged by the Strategy will not be straightforward.

Hydroelectricity
The country’s main renewable energy source is hydroelectricity, with an installed capacity of about 27 GW and a production of 69.2 TWh of electricity in 2009. As of September 2011, Japan had 1,198 small hydropower plants with a total capacity of 3,225 MW. The smaller plants accounted for 6.6 percent of Japan’s total hydropower capacity. The remaining capacity was filled by large and medium hydropower stations, typically sited at large dams. Cost per kilowatt-hour for power from smaller plants was high at ¥15–100, hindering further development of the energy source.

Solar power
Japan was the world’s second largest producer of photovoltaic electricity in the early 2000s, although solar was a very minor contribution to the total at that time. The country was overtaken by Germany in 2005, a year in which Japan had 38% of the world supply compared to Germany’s 39%. Since then, Japan had been slow to increase solar capacity compared to other countries until 2012.

On 1 July 2012, after the nuclear disaster at Fukushima, new tariffs for renewable energy were introduced by the Japanese government. The tariffs, set at ¥42 per kWh over the next 20 years to solar power producers, were among the highest in the world. With the incentives in place, Japan added 1,718 MW of solar power in 2012. By the end of the year, Japan’s total solar capacity was 7.4 GW. Japan has seen sustained growth of solar PV capacity after 2012, reaching a cumulative installed capacity of 34 GW by the end of 2015, generating 3.5% of the national electricity consumption in that year.

Wind power
Japan had 1,807 wind turbines with a total capacity of 2440 MW as of September 2011. Lack of locations with constant wind, environmental restrictions, and emphasis by power utilities on fossil and nuclear power hinders the employment of more wind power in the country. However, it has been estimated that Japan has the potential for 144 GW for onshore wind and 608 GW of offshore wind capacity.

Geothermal energy
Of other renewable energy sources, Japan has partially exploited geothermal energy. The country had six geothermal power stations with a combined capacity of 133 megawatts in 1989. By 2011, the country had 18 geothermal plants. Japan has the third largest geothermal reserves in the world, and geothermal energy in particular is being heavily focused on as a source of power following the Fukushima disaster and subsequent shut down of all nuclear reactors. The Ministry of Economy, Trade, and Industry is currently exploring over 40 locations to see if geothermal energy plants would be compatible.

Waste and biomass energy
As of September 2011, Japan had 190 generators attached to municipal waste units and 70 independent plants using biomass fuel to produce energy. In addition, 14 other generators were used to burn both coal and biomass fuel. In 2008, Japan produced 322 million tons of biomass fuel and converted 76% of it into energy.

Ocean energy
In 2012, the government announced plans to build experimental tidal power and wave power plants in coastal areas. Construction on the projects, the locations for which have not been determined, would begin in 2013.

Electricity

In 2014, Japan ranked fifth in the world by electricity production, after the United States, China, Russia, and India with 934 TWh produced during that year.

In terms of per capita electricity consumption, the average person in Japan consumed 8,459 kWh in 2004 compared to 14,240 kWh for the average American. In that respect it ranked 18th among the countries of the world. Its per capita electricity consumption increased by 21.8% between 1990 and 2004.

Japan had 282 GW of total installed electricity generating capacity in 2010, the third largest in the world behind the United States and China. However, after the damage by the 2011 earthquake, capacity is estimated to be around 243 GW in mid-2011. It is one of the world’s largest users of solar energy, in fourth place behind Germany, Italy, and China. With 53 active nuclear power generating reactor units in 2009, that year Japan ranked third in the world in that respect, after the United States (104 reactors) and France (59). Almost one quarter (24.93%) of its electricity production was from nuclear plants, compared to 76.18% for France and 19.66% for the United States. However, after the 2011 Tōhoku earthquake and tsunami and the subsequent Fukushima Daiichi nuclear disaster, all plants eventually shut down in May 2012 and Ōi Nuclear Power Plant was restarted and operational between June 2012 and September 2013. On 11 August 2015 and 1 November 2015, the two nuclear reactor of the Sendai Nuclear Power Plant were restarted respectively.

Since the generation disruption caused by the Fukushima disaster, rapid steps have been made to liberalize the electricity supply market. One way this was done in Japan is through the feed-in-tariff scheme. This was announced in 2012 as a direct consequence of the Fukushima disaster. The feed-in-tariff scheme encourages utility operators and companies to purchase and invest in renewable energy. The Ministry of Economy, Trade and Industry set prices for various renewable energy sources to encourage the production and consumption of renewable energy. In April 2016 domestic and small business customers became able to select from over 250 supplier companies competitively selling electricity. Also wholesale electricity trading on the Japan Electric Power Exchange has been encouraged.

Primary energy consumption
The Japan is a densely populated country (127.35 million people in July 2013 – 10 th world rank – of 377 488 km 2 , or 337 inhabitants / km2 , slightly less than in India: 368 hab / km 2 in 2011) and a very high standard of living (GDP in purchasing power parity: $ 36,266 / inhabitant in 2012), therefore a major consumer of energy.

The primary energy consumption per capita was 3.38 toe in Japan in 2015 s 9 against 1.86 toe of world average, but 6.80 toe for the US.

Gross Domestic Consumption of Primary Energy in Japan by Source ( Mtep )
Source 1990 % 2000 % 2010 % 2014 2015 % 2015 var.
2015/1990
Coal 76.46 17.4 97.16 18.7 115.12 23.1 118.46 117.46 27.3% +54%
Oil 250.41 57.1 255.21 49.2 202.30 40.6 190.86 184.87 43.0% -26%
Natural gas 44,16 10.1 65.65 12.6 86,01 17.2 106.64 100.03 23.3% + 127%
Total fossils 371.03 84.6 418.04 80.5 403.43 80.9 415.96 402.36 93.6% + 8%
Nuclear 52.71 12.0 83.93 16.2 75.11 15.1 0 2.46 0.6% -95%
Hydraulic 7.47 1.7 7.33 1.4 7.07 1.4 7.03 7.33 1.7% -2%
Biomass waste 4.52 1.0 4.72 0.9 9.32 1.9 10.94 11.39 2.7% + 152%
Solar, wind, geoth. 2.96 0.7 4.04 0.8 3.60 0.7 5.29 6.25 1,5% +111%
Total EnR 14.95 3.4 16,09 3.1 19.98 4.0 23.26 24.97 5.8% +67%
Total 438.70 100 518.01 100 498.53 100 439.23 429.79 100% -2%
Data source: IEA

The collapse of nuclear power (- 72.65 Mtoe ) between 2010 and 2015 was offset mainly by a sharp drop in consumption: – 68.82 Mtoe , and secondarily by the increase in renewable energies: + 4.99 Mtoe . The 13.8% drop in total consumption is partly explained by a temperature effect: 2010 was marked by a very hot summer that caused a sharp increase in air conditioning; the 0.8% drop in the population also contributed; but the main factor of this fall is the relocation of many factories after the disaster of 2011 .

National grid
Unlike most other industrial countries, Japan doesn’t have a single national grid but instead has separate eastern and western grids. The standard voltage at power outlets is 100 V, but the grids operate at different frequencies: 50 Hz in Eastern Japan and 60 Hz in Western Japan. The grids are connected together by 3 frequency converter stations (Higashi-Shimizu, Shin Shinano and Sakuma), but these can only handle 1 GW. A converter station also exists at Minami-Fukumitsu. The 2011 Tōhoku earthquake and tsunami resulted in 11 reactors being taken offline with a loss of 9.7GW. The 3 converter stations did not have the capacity to transfer enough power from Japan’s western power grid to significantly help the eastern grid.

The two grids were originally developed by separate companies. Tokyo Electric Light Co was established in 1883 which also established electric power in Japan. In 1885 demand had grown enough that TELCO bought generation equipment from AEG of Germany. The same happened in the western parts of Japan with General Electric being the supplier to Osaka Electric Lamp. GE’s equipment used the US standard 60 Hz while AEG’s equipment used the European standard of 50 Hz.

Utilities
In Japan, the electricity market is divided up into 10 regulated companies:

Chugoku Electric Power Company (CEPCO)
Chubu Electric Power (Chuden)
Hokuriku Electric Power Company (Hokuden)
Hokkaido Electric Power Company (HEPCO)
Kyushu Electric Power (Kyuden)
Kansai Electric Power Company (KEPCO)
Okinawa Electric Power Company (Okiden)
Tokyo Electric Power Company (TEPCO)
Tohoku Electric Power (Tohokuden)
Shikoku Electric Power Company (Yonden)

Hydrogen energy
In March 2016, METI set a target of 40,000 hydrogen fuel-cell vehicles on Japan’s roads by 2020 and 160 fueling stations.

Carbon emissions
In 2014 Japan was the 6th largest producer of carbon emissions. In 2013 Japan ranked 28 in the list of countries by carbon dioxide emissions per capita.

In 2007, the BBC reported that Japan was having difficulty in meeting its 6% reduction target under the Kyoto Protocol partly because Japanese businesses were already very energy efficient. Despite this, in May 2007, the former Prime Minister Shinzō Abe said that world emissions should be reduced by 50% by 2050. He expected Japan to play a leading role in such an effort. “We must create a new framework which moves beyond the Kyoto Protocol, in which the entire world will participate in emissions reduction,” Abe said.

However, since the events of the Tohoku earthquake, carbon emissions from energy production have increased to near record levels, with 1227Mt released from energy production as opposed to the Kyoto Protocol target of 1136Mt (8% reduction from 1235Mt), just a 0.6% decrease in energy production emissions. The increased use of gas and coal to make up for lost nuclear capacity increased CO2 production by over 3% despite an electrical demand drop of nearly 15%.

Carbon dioxide emissions
(thousands of metric tons of CO2)
compared to 1990 level
Year CO2 Change
1990 1,072,420 0%
1991 1,094,350 2.04%
1992 1,106,500 3.18%
1993 1,081,490 0.85%
1994 1,132,560 5.61%
1995 1,138,750 9.19%
1996 1,169,550 9.06%
1997 1,170,120 9.11%
1998 1,130,600 5.43%
1999 1,165,720 8.7%
2000 1,207,980 12.64%
2001 1,191,390 11.09%
2002 1,205,480 12.41%
2003 1,233,640 15.03%
2004 1,259,659 17.46%
2005 1,238,181 15.46%
2006 1,231,298 14.81%
2007 1,251,169 16.67%
2008 1,207,686 12.61%
2009 1,101,134 2.68%